Publications

TN8 - Concrete Bridge Construction Methods – Arches & Frames

TN8 - Concrete Bridge Construction Methods – Arches & Frames

£12.50
This note examines the various methods for the design and construction of concrete arches, frames, tunnels and jacked boxes, which cover the whole range of bridges from the smallest culverts to the largest concrete spans in the world. 

Published: 2014
Format: PDF
Pages: 5
  • Brand:
    Concrete Bridge Development Group
  • Product Code:
    CBDG/TN8